| Report date |
Link to report |
More information |
| Jul 2008 |
How to Reduce Tire-Pavement Noise: Interim Better Practices for Constructing and Texturing Concrete Pavement Surfaces, 5 mb pdf
|
Project details |
| Jun 2008 |
Task 6: Material Thermal Input for Iowa Materials, 4.6 mb pdf
|
Project details |
| May 2008 |
Field Evaluation of Elliptical Steel Dowel Performance--Final Report, 637 kb pdf
|
Project details |
| Apr 2008 |
Rehabilitation of Concrete Pavements Utilizing Rubblization and Crack-and-Seat Methods: Phase II - Performance Evaluation of Rubblized Pavements in Iowa, 8 mb pdf
|
Project details |
| Mar 2008 |
Material and Construction Optimization for Prevention of Premature Pavement Distress in PCC Pavements: Final Report, 12.7 mb pdf
|
Project details |
| Dec 2007 |
Developing an Effective Construction Training Program for Hispanic Supervisors and Craft Workers, Phase 4, 290 kb pdf
|
Project details |
| Dec 2007 |
Nondestructive Evaluation of Iowa Pavements, Phase 1, 4.5 mb pdf
|
Project details |
| Dec 2007 |
Development of Performance Properties of Ternary Mixtures: Phase I Final Report, 4 mb pdf
|
Project details |
| Sep 2007 |
Improving Portland Cement Concrete Mix Consistency and Production Rate through Two-Stage Mixing, 4.5 mb pdf
|
Project details |
| Aug 2007 |
ISU-FHWA-ACPA Concrete Pavement Surface Characteristics Program Part 2: Preliminary Field Data Collection, 16.4 mb pdf
|
Project details |
| May 2007 |
Task 4: Testing Iowa Portland Cement Concrete Mixtures for the AASHTO Mechanistic-Empirical Pavement Design Procedure, 1.8 mb pdf
|
Project details |
| Jan 2007 |
Impact of Curling, Warping, and Other Early-Age Behavior on Concrete Pavement Smoothness: Early, Frequent, and Detailed (EFD) Study, 9 mb pdf
|
Project details |
| Jan 2007 |
Developing a Simple and Rapid Test for Monitoring the Heat Evolution of
Concrete Mixtures for Both Laboratory and Field Applications, 738 kb pdf
|
Project details |
| Dec 2006 |
Field Evaluation of Elliptical Steel Dowel Performance--Interim Report, 1.1 mb pdf
|
Project details |
| Aug 2006 |
Evaluation of Composite Pavement Unbonded Overlays: Phase III (TR-478, HR-1093, Proj. 2), 2 mb pdf
|
Project details |
| Jul 2006 |
Evaluation of U.S. and European Concrete Pavement Noise Reduction Methods, 2.5 mb pdf
|
Project details |
| Jul 2006 |
Southeast Michigan Local Road Concrete Road Durability Study, 1.8 mb pdf
|
Project details |
| Jun 2006 |
Evaluation of Unbonded Ultrathin Whitetopping of Brick Streets (TR-466), 1.5 mb pdf
|
Project details |
| Jun 2006 |
Using Scanning Lasers for Real-Time Pavement Thickness Measurement, Phase I (TR-538), 2.1 mb pdf
|
Project details |
| May 2006 |
Developing an Effective Construction Training Program for Hispanic Supervisors and Craft Workers, Phase 3, 5.8 mb pdf
|
Project details |
| Apr 2006 |
Laboratory Study of Structural Behavior of Alternative Dowel Bars (Proj. 7), 2.5 mb pdf
|
Project details |
| Mar 2006 |
Field Evaluation of Compaction Monitoring Technology: Phase 2, 13.2 mb pdf
|
Project details |
| Mar 2006 |
Materials and Mix Optimization Procedures for PCC Pavements (TR-484, Proj. 3), 1.7 mb pdf
|
Project details |
| Feb 2006 |
Mix Design Development for Pervious Concrete in Cold Weather Climates, 3.2 mb pdf
|
Project details |
| Feb 2006 |
Mix Design Development for Pervious Concrete in Cold Weather Climates, 3.2 mb pdf
|
Project details |
| Jan 2006 |
Evaluation of Transverse Joint Forming Methods in PCC Pavement (TR-532), 3.9 mb pdf
|
Project details |
| Jan 2006 |
Simple and Rapid Test for Monitoring the Heat Evolution of Concrete Mixtures for Laboratory and Field Applications, Phase I (Proj. 17), 1.1 mb pdf
|
Project details |
| Dec 2005 |
Impact to Concrete Pavement Smoothness from Curling, Warping, and Other Early-Age Behavior: Early, Frequent, and Detailed (Proj. 16), 2.1 mb pdf
|
Project details |
| Dec 2005 |
Field Experiments of Current Concrete Pavement Surface Characteristics Practices: Iowa Data Collection and Analysis, 901 kb pdf
|
Project details |
| Nov 2005 |
Self-Consolidating Concrete--Applications for Slip Form Paving, Phase 1, 9 mb pdf
|
Project details |
| Sep 2005 |
Design and Construction Procedures for Concrete Overlay and Widening of Existing Pavements (TR-511, Proj. 6), 5.3 mb pdf
|
Project details |
| Aug 2005 |
In Situ Detection Methods for Materials-Related Distress in Concrete Pavements: Phase II (HR-1081, Proj. 1), 524 kb pdf
|
Project details |
| Jun 2005 |
Spanish as a Second Language Survival Course and Concrete Pavement Basics Course, 21.3 mb pdf
|
Project details |
| Jun 2005 |
Field Evaluation of Elliptical Fiber Reinforced Polymer Dowel Performance (Proj. 5), 2 mb pdf
|
Project details |
| Jun 2005 |
The Concrete Pavement Road Map: Long Term Plan for Concrete Pavement Research and Technology
|
Project details |
| May 2005 |
Developing an Effective Construction Training Program for American Supervisors and Hispanic Craft Workers, 1.4 mb pdf
|
Project details |
| May 2005 |
Measuring Pavement Profile at the Slip-Form Paver (TR-512, Proj. 12), 1.96M pdf
|
Project details |
| Apr 2005 |
Volume I: Engineering Properties and Construction Guidelines, 6.7 mb pdf
|
Project details |
| Dec 2004 |
Attributes of Good In-Service Concrete Pavements (Proj. 9), 1.2 mb pdf
|
Project details |
| Oct 2004 |
Development of Object-Oriented Specifications for Iowa DOT and Urban Standards (TR-487), 3.9 mb pdf
|
Project details |
| Sep 2004 |
Field Evaluation of Compaction Monitoring Technology, Phase 1 (TR-495), 7 mb pdf
|
Project details |
| Sep 2004 |
Two-Lift Concrete Pavements to Meet Public Needs (Proj. 8), 286 kb pdf
|
Project details |
| Sep 2004 |
Material and Construction Optimization for Prevention of Premature Pavement Distress in PCC Pavements, Phases I and II, 2.6 mb pdf
|
Project details |
| Jun 2004 |
Performance Properties of Ternary Mixtures for Concrete Pavements: Scoping Study (Proj. 13), 369 kb pdf
|
Project details |
| May 2004 |
Determination of the Optimum Base Characteristics for Pavements (TR-482), 11.9 mb pdf
|
Project details |
| Mar 2004 |
Smooth, Quiet, Safe Concrete Pavements: Scoping Study (Proj. 14), 234 kb pdf
|
Project details |
| Feb 2004 |
Stringless Concrete Paving (TR-490), 1.2 mb pdf
|
Project details |
| Jan 2004 |
Portland Cement Concrete Patching Techniques vs. Performance and Traffic Delay, 1.8 mb pdf
|
Project details |
| Jan 2004 |
Developing an Effective Construction Training Program for Hispanic Supervisors and Craft Workers, Phase 1, 2.7 mb pdf
|
Project details |
| Dec 2003 |
Properties of Blended Cements for Concrete Pavements, 1.2 mb pdf
|
Project details |
| Jul 2003 |
In Situ Detection Methods for Materials-Related Distress in Concrete Pavements, Phase I (Proj. 1), 5.2 MB pdf
|
Project details |
| Apr 2003 |
Evaluation of Composite Pavement Unbonded Overlays, Phases I and II (TR-478, Proj. 2), 2.1 mb pdf
|
Project details |
| Mar 2003 |
Improved Pavement Curing Materials and Techniques: Part 2 (Phase III) (TR-479), 677KB pdf
|
Project details |
| Aug 2002 |
Synthesis of Dowel Bar Research (HR-1080), 1.02MB pdf
|
Project details |
| Apr 2002 |
Improved Pavement Curing Materials and Techniques: Part 1 (Phases I and II) (TR-451), 705KB pdf
|
Project details |
| Oct 2001 |
Dowel Bar Optimization, Phases I and II, 285k pdf
|
Project details |